Sök

Din sökning på 'shipyards' gav 18 resultat
Fess-sök
  1. 26.8.2025 | Construction of the Finnish Navy's third Pohjanmaa-class multi-purpose corvette began on August 26 2025 with the traditional steel cutting ceremony.
    https://puolustusvoimat.fi/en/-/construction-of-the-third-pohjanmaa-class-multi-purpose-corvette-began-at-the-rauma-shipyard
  2. Squadron 2020 The Squadron 2020 combat vessel project is the Defence Forces’ strategic capability project. For Finland’s defence capability the project is significant. The project to replace the Navy’s combat vessels was launched in 2015, and an i...
    https://merivoimat.fi/en/squadron-2020
  3. Pohjanmaa-class to strengthen Finland's defence capability The Pohjanmaa-class corvettes ensure that the Navy will be able to carry out its statutory defense tasks in the future and control the sea and archipelago areas that are important for its ...
    https://merivoimat.fi/en/pohjanmaa-class
  4. 24.2.2026 | Hull assembly of the second Pohjanmaa-class multi-role corvette being built for the Finnish Navy was completed at the turn of the year at the Rauma shipyard. The vessel has received its grey protective coating, and part of the protective covering has been removed.
    https://puolustusvoimat.fi/en/-/launch-of-the-second-pohjanmaa-class-multi-role-corvette-approaching
  5. 24.2.2026 | Hull assembly of the second Pohjanmaa-class multi-role corvette being built for the Finnish Navy was completed at the turn of the year at the Rauma shipyard. The vessel has received its grey protective coating, and part of the protective covering has been removed.
    https://logistiikkalaitos.fi/en/-/1948673/launch-of-the-second-pohjanmaa-class-multi-role-corvette-approaching
  6. 14.1.2026 | The Squadron 2020 programme is progressing as planned. Steel cutting for the fourth Pohjanmaa-class multi-role corvette has commenced, and the keel of the third vessel has been laid in accordance with naval tradition at the Rauma Marine Constructions (RMC) shipyard. With these milestones, construction of all vessels included in the programme is now underway.
    https://merivoimat.fi/en/-/1948673/construction-of-the-final-pohjanmaa-class-multi-role-corvette-has-begun
  7. 14.1.2026 | The Squadron 2020 programme is progressing as planned. Steel cutting for the fourth Pohjanmaa-class multi-role corvette has commenced, and the keel of the third vessel has been laid in accordance with naval tradition at the Rauma Marine Constructions (RMC) shipyard. With these milestones, construction of all vessels included in the programme is now underway.
    https://logistiikkalaitos.fi/en/-/1948673/construction-of-the-final-pohjanmaa-class-multi-role-corvette-has-begun
  8. 14.1.2026 | The Squadron 2020 programme is progressing as planned. Steel cutting for the fourth Pohjanmaa-class multi-role corvette has commenced, and the keel of the third vessel has been laid in accordance with naval tradition at the Rauma Marine Constructions (RMC) shipyard. With these milestones, construction of all vessels included in the programme is now underway.
    https://puolustusvoimat.fi/en/-/construction-of-the-final-pohjanmaa-class-multi-role-corvette-has-begun
  9. 11.4.2024 | The building of the first multi-purpose corvette included in the Squadron 2020 project has advanced to the keel laying phase. A traditional keel laying ceremony was celebrated at Rauma shipyard on Thursday 11 April 2024.
    https://merivoimat.fi/en/-/keel-of-the-first-pohjanmaa-class-corvette-was-laid
  10. 9.5.2025 | The keel of the second Pohjanmaa-class multi-role corvette, part of the Squadron 2020 programme, was laid at Rauma shipyard on Thursday, 8 May 2025. The keel laying ceremony is a traditional and symbolically significant milestone in shipbuilding, marking the official start of hull assembly.
    https://puolustusvoimat.fi/en/-/keel-laying-of-second-pohjanmaa-class-multi-role-corvette-in-rauma
  11. 3.2.2025 | The first multi-role corvette of the Pohjanmaa-class, being built for the Finnish Navy, has reached the "hull completed" phase at the end of 2024 and its hull assembly now finished. The protective covering, which shielded the vessel during the painting phase, was removed in early February. Outfitting of the vessel continues at Rauma Marine Constructions' (RMC) shipyard in Rauma, and the official launch will take place later this spring.
    https://puolustusvoimat.fi/en/-/hull-of-the-first-pohjanmaa-class-corvette-completed
  12. 11.4.2024 | The building of the first multi-purpose corvette included in the Squadron 2020 project has advanced to the keel laying phase. A traditional keel laying ceremony was celebrated at Rauma shipyard on Thursday 11 April 2024.
    https://puolustusvoimat.fi/en/-/1951215/keel-of-the-first-pohjanmaa-class-corvette-was-laid
  13. 26.9.2019 | The contracts concerning the Defence Forces’ strategic project, the procurement and construction of the Pohjanmaa Class combat vessels were signed in Turku on Thursday 26 September 2019. The Finnish Defence Forces Logistics Command, Rauma Marine Construction Oy, Saab Ab and the Finnish Navy participated in the signing of the contracts.
    https://merivoimat.fi/en/-/pohjanmaa-luokan-korvettien-sopimukset-allekirjoitettiin-turussa
  14. 26.9.2019 | The contracts concerning the Defence Forces’ strategic project, the procurement and construction of the Pohjanmaa Class combat vessels were signed in Turku on Thursday 26 September 2019. The Finnish Defence Forces Logistics Command, Rauma Marine Construction Oy, Saab Ab and the Finnish Navy participated in the signing of the contracts.
    https://puolustusvoimat.fi/en/-/1951215/pohjanmaa-luokan-korvettien-sopimukset-allekirjoitettiin-turussa
  15. 19.12.2016 | The Finnish Defence Forces' Logistics Command will send requests to 12 domestic and foreign companies to participate in tendering for a battle system for the Squadron 2020 vessels. Replies are expected by 13.2.2017. After this date an invitation to negotiate and an invitation to tender will be sent to selected suppliers during spring. The battle system will be competitively tendered; this will include the integration of systems into the vessels.
    https://puolustusvoimat.fi/en/-/puolustusvoimien-logistiikkalaitos-lahettaa-laivue-2020-n-alusten-taistelujarjestelman-osallistumishakemuspyynnon
  16. 14.9.2016 | The Defence Forces are evaluating the possibility to purchase surface combatants for the Navy’s Squadron 2020 project from the shipyard of Rauma Marine Constructions. The combat system of the vessels will be competitively tendered as comprehensive deliveries and services. It will consist of a command and control system, sensors and weapons. Competitive tendering of combat system suppliers will be launched during 2016. The Squadron 2020 will reach a full operational readiness in 2026-27.
    https://puolustusvoimat.fi/en/-/puolustusvoimat-ja-rauma-marine-constructions-oy-solmivat-aiesopimuksen
  17. 2.11.2016 | The third Katanpää class mine counter-measure vessel was handed over to the Finnish Navy in Italy today.
    https://puolustusvoimat.fi/en/-/1951215/miinantorjunta-alus-vahterpaa-luovutettiin-merivoimille
  18. 22.2.2018 | Hamina-luokan aluksissa tehdään elinkaaren puolivälin päivitystä 220 miljoonalla eurolla.
    https://ruotuvaki.fi/-/hamina-luokka-luo-kaiken-paitsi-nahkansa