Haku

Hakusi sanalla 'construction' tuotti 249 tulosta
Fess-haku
  1. 14.1.2026 | The Squadron 2020 programme is progressing as planned. Steel cutting for the fourth Pohjanmaa-class multi-role corvette has commenced, and the keel of the third vessel has been laid in accordance with naval tradition at the Rauma Marine Constructions (RMC) shipyard. With these milestones, construction of all vessels included in the programme is now underway.
    https://merivoimat.fi/en/-/1948673/construction-of-the-final-pohjanmaa-class-multi-role-corvette-has-begun
  2. 14.1.2026 | The Squadron 2020 programme is progressing as planned. Steel cutting for the fourth Pohjanmaa-class multi-role corvette has commenced, and the keel of the third vessel has been laid in accordance with naval tradition at the Rauma Marine Constructions (RMC) shipyard. With these milestones, construction of all vessels included in the programme is now underway.
    https://puolustusvoimat.fi/en/-/construction-of-the-final-pohjanmaa-class-multi-role-corvette-has-begun
  3. 14.1.2026 | The Squadron 2020 programme is progressing as planned. Steel cutting for the fourth Pohjanmaa-class multi-role corvette has commenced, and the keel of the third vessel has been laid in accordance with naval tradition at the Rauma Marine Constructions (RMC) shipyard. With these milestones, construction of all vessels included in the programme is now underway.
    https://logistiikkalaitos.fi/en/-/1948673/construction-of-the-final-pohjanmaa-class-multi-role-corvette-has-begun
  4. 9.10.2024 | Rauma Marine Constructions (RMC Defence) has started the construction of the second multi-role corvette included in the Squadron 2020 project. Today, the 9th of October, the cutting of the steel structures for the hull of the second vessel of the Squadron started in the presence of invited guests in Rauma.
    https://merivoimat.fi/en/-/construction-of-the-second-pohjanmaa-class-corvette-launched-in-rauma
  5. 26.8.2025 | Construction of the Finnish Navy's third Pohjanmaa-class multi-purpose corvette began on August 26 2025 with the traditional steel cutting ceremony.
    https://puolustusvoimat.fi/en/-/construction-of-the-third-pohjanmaa-class-multi-purpose-corvette-began-at-the-rauma-shipyard
  6. 9.10.2024 | Rauma Marine Constructions (RMC Defence) has started the construction of the second multi-role corvette included in the Squadron 2020 project. Today, the 9th of October, the cutting of the steel structures for the hull of the second vessel of the Squadron started in the presence of invited guests in Rauma.
    https://puolustusvoimat.fi/en/-/1951215/construction-of-the-second-pohjanmaa-class-corvette-launched-in-rauma
  7. Pohjanmaa-class to strengthen Finland's defence capability The Pohjanmaa-class corvettes ensure that the Navy will be able to carry out its statutory defense tasks in the future and control the sea and archipelago areas that are important for its ...
    https://merivoimat.fi/en/pohjanmaa-class
  8. Guidelines for observing the Defence Forces’ activities in wind power building In accordance with section 24 of the Land Use and Building Act (132/1999), in all land use planning, national land use objectives must be taken into account in a way th...
    https://puolustusvoimat.fi/en/wind-farm-consultation-process
  9. Saber Strike 18 in Estonia The Finnish Army will take part in the international training exercise Saber Strike 18 that is led by the US European Command and will be organised in Tapa, Estonia, from 7 to 15 June 2018. Organised in the Baltic region...
    https://maavoimat.fi/en/saber-strike-18-en
  10. Laivue 2020 Laivue 2020 -taistelualushanke on Puolustusvoimien strateginen suorituskykyhanke. Suomen puolustuskyvylle hanke on merkittävä. Merivoimien taistelualusten korvaaminen käynnistyi vuonna 2015 ja investointipäätös tehtiin vuonna 2019. Osa...
    https://merivoimat.fi/laivue-2020
  11. The Finnish Defence Forces and the environment The Defence Forces take the environment into account in everything they do. We want to minimise risk and damage inflicted on the environment while carrying out our mandatory tasks (national defence, a...
    https://puolustusvoimat.fi/en/fdf-and-the-environment
  12. 24.2.2026 | Hull assembly of the second Pohjanmaa-class multi-role corvette being built for the Finnish Navy was completed at the turn of the year at the Rauma shipyard. The vessel has received its grey protective coating, and part of the protective covering has been removed.
    https://logistiikkalaitos.fi/en/-/1948673/launch-of-the-second-pohjanmaa-class-multi-role-corvette-approaching
  13. 24.2.2026 | Hull assembly of the second Pohjanmaa-class multi-role corvette being built for the Finnish Navy was completed at the turn of the year at the Rauma shipyard. The vessel has received its grey protective coating, and part of the protective covering has been removed.
    https://puolustusvoimat.fi/en/-/launch-of-the-second-pohjanmaa-class-multi-role-corvette-approaching
  14. 24.2.2026 | Hull assembly of the second Pohjanmaa-class multi-role corvette being built for the Finnish Navy was completed at the turn of the year at the Rauma shipyard. The vessel has received its grey protective coating, and part of the protective covering has been removed.
    https://merivoimat.fi/en/-/1948673/launch-of-the-second-pohjanmaa-class-multi-role-corvette-approaching
  15. Security clearances You may be subject to personnel security clearance vetting due to activity related to the Finnish Defence Forces. This site will provide you with information about consenting to security clearance vetting. Security clearance ve...
    https://puolustusvoimat.fi/en/security-clearances
  16. Squadron 2020 The Squadron 2020 combat vessel project is the Defence Forces’ strategic capability project. For Finland’s defence capability the project is significant. The project to replace the Navy’s combat vessels was launched in 2015, and an i...
    https://merivoimat.fi/en/squadron-2020
  17. C5 Division Defence Command Finland C5 Division of Defence Command Finland is responsible for the preparation of the decision-making process and governance for the management system sector. The C5 sector is responsible for the planning, constructi...
    https://puolustusvoimat.fi/en/c5-division-defence-command-finland
  18. Flottilj 2020 Stridsfartygsprojektet Flottilj 2020 är ett av Försvarsmaktens strategiska prestationsförmågeprojekt. Projektet är centralt för Finlands försvarsförmåga. Arbetet med att ersätta Marinens stridsfartyg med nya inleddes 2015 och beslut ...
    https://merivoimat.fi/sv/flottilj-2020
  19. Press releases and articles
    https://logistiikkalaitos.fi/en/news
  20. Opening hours Military Museum´s Manege and Artillery Manege Suomenlinna, Iso Mustasaari, Helsinki 1 October–30 April open Wed–Mon 11:00–16:30, on Tuesdays closed 1 May–30 September open Mon–Sun 11:00–18:00 Last admittance 30 minutes before closing...
    https://sotamuseo.fi/en/opening-hours